Municipal Infrastructure & Traffic Engineering
Rapid Supply of 15,000m Water-Filled Road Barriers for Riyadh Infrastructure Expansion

Client Challenge
A major contracting consortium needed over 10,000 water-filled traffic barriers within 10 days to secure highway road-widening work zones, facing severe port delays on overseas shipments.
Our Engineering Solution
AERMAK mobilized our automated PE blow molding lines in Riyadh, delivering certified, red and white reflective water horses directly to highway sites on a 24-hour round-the-clock dispatch schedule.
Engineered Resin: High Molecular Weight High-Density Polyethylene (HMW-HDPE)
Key Outcomes
Delivered 100% of requirement on schedule; 0 work zone delays; 100% compliance with Saudi Ministry of Transport impact absorption and reflectivity standards.